Powered by Google

M42 to be reduced to two lanes during resurfacing work

A SECTION of the M42 will be reduced to two lanes until April to allow resurfacing work to take place.

Restrictions will be in place between Junction 10 at Tamworth and Junction 9 at Sutton Coldfield from Monday. The steel central reservation will be replaced with a concrete barrier.

Share